Glossary
Scaffold, fence and plan terms
The words you meet in our tutorials and on the plans, explained simply. Standards are Canadian and cited by edition and article.
The scaffold
- Bay
- Space between two adjacent standards or frames, along the length of the scaffold. A scaffold's length is always made of whole bays.
- Lift
- Height between two levels of the scaffold. For a stair, height climbed by one flight.
- Standard
- Vertical load-bearing tube. It carries the loads down to the screw jack and the sole plate.
- Frame
- Prefabricated unit of two standards joined by cross members. Frames are stacked to build the scaffold up.
- Cross brace
- Pair of crossed tubes between two frames that braces the scaffold.
- Platform
- Working or access surface of the scaffold, made of decks.
- Deck
- Prefabricated platform unit set between two ledgers or frame bearers.
- Hatch deck
- Deck with a hatch that lets the access ladder pass from one level to the next. Scaffold places one at every lift of the access bay.
- Guardrail
- Fall protection at the edge of a platform: top rail, mid-rail and toeboard.
- Toeboard
- Board set on edge at the platform edge, which stops objects from falling.
- Screw jack
- Adjustable threaded base under a standard, used to level the scaffold.
- Sole plate
- Timber piece under the screw jack that spreads the load on the ground. A scaffold's footprint includes its sole plates.
- Tie
- Connection of the scaffold to the wall or structure, which holds it against overturning and wind. Each tie needs a pull-out test before installation.
- Wall gap
- Distance between the edge of the platform and the wall. A platform more than 350 mm from the wall needs a guardrail on the wall side (CSTC, s. 3.9.8).
Loads and wind
- Duty class
- Live load per platform: light 1.2 kPa, intermediate 2.4 kPa, heavy 3.6 kPa (CSA S269.2-16, clause 6.2.3). A province may set a higher minimum, such as Ontario at 2.4 kPa. Scaffold never picks it for you.
- Load takedown
- Load each standard transmits to its support (dead load and live load, unfactored) and pressure under the sole plate.
- q1/50
- Hourly wind pressure with a 1-in-50 annual probability of being exceeded, at the site (NBC 2020, Appendix C, Table C-2). Fencing and Scaffold use it for the wind check.
- Overturning
- A panel or scaffold tipping over under wind. The plan compares the overturning moment with the resisting moment of the bases and ballast.
- Moment ratio
- Resisting moment divided by overturning moment. Below 1.00, the fence overturns; at 1.00, it just holds, with no margin.
The site fence
- Hoarding
- Site fence that closes the site, often along a scaffold on the street side, and protects passers-by.
- Fence panel
- Prefabricated fence unit, mesh in the examples, set on bases. No panel is cut: when a run does not come out even, the last panel overlaps the one before.
- Fence base
- Concrete block that holds the panel posts. At a joint, a single base takes the posts of both adjacent panels.
- Stay
- Diagonal member, with its base, that holds the fence on the site side, at each corner and each end of a fixed fence. A ballasted stay also helps the fence hold against wind.
- Ballast
- Weight placed on the bases so the fence does not overturn in the wind. The plan calculates the weight to place on each base.
- Clearance
- Distance between the scaffold and the hoarding, on the street side and at both ends. Fencing needs it to place the fence.
- Scaffold footprint
- Ground area taken by the scaffold, plus a geometric clearance of 0.60 m by default. No part of the hoarding may enter it. This clearance is a design assumption, not a regulatory minimum.
- Public walkway
- Protected passage for pedestrians, between the hoarding and the street.
- Lot line
- Boundary of the site's land, on the street side or on the sides. Without it, the plan does not check whether the hoarding or the public walkway goes past it.
- Party wall
- Wall shared with the neighbouring building, at the end of a façade. The scaffold stops at that end, without the sole plate crossing the limit.
- Total footprint
- Total length the scaffold takes on the ground, sole plates included. The plan gives it with the clear space to each limit.
The plan and its documents
- Preliminary
- First status of a plan, before FOR APPROVAL and APPROVED FOR ERECTION. Only the last one allows erection. Each revision sets the plan back to PRELIMINARY.
- Drawing number
- Number that identifies the plan, the same on every sheet (ECH-… for Scaffold, CLO-… for Fencing). Quote it with its revision.
- Revision
- Letter of the plan's version (A, B, C…). The revision table gives its date, purpose and author.
- Title block
- Box at the bottom right of each sheet: company, title, site, authors, scale, drawing number, revision and status.
- Bill of materials
- List of the plan's parts: item, quantity, description, part number, dimensions and weights. Weights are indicative.
- Not in catalogue
- Note in the bill of materials for a part missing from the company's library. The plan keeps the generic part.
- Not checked
- Check the plan does not perform because a value is missing. The line names it, and the revision that receives it adds the check.
- TK reference and check code
- "Ref. TK-…" identifies the delivery: the plan, its revision and all its files. The check code comes from a signature only TektonAI can produce. The QR code opens the public verification page.
- IFC model
- 3D model of a building, in the open IFC format, supplied by the architect. Scaffold reads its storeys, walls, doors and windows.
- CAD plan (DXF)
- Plan in DXF format, to open in drawing software. It arrives a few minutes after the other files.
- 3D model (STEP)
- 3D model of the scaffold in STEP format, to open in drawing or modelling software.
Rules and standards
- NBC 2020
- National Building Code of Canada, 2020 edition. On the plans, the article cited follows the acronym.
- CSTC
- Quebec Safety Code for the construction industry (CQLR, c. S-2.1, r. 4), cited by section. Subdivision 3.9 covers scaffolds.
- CNESST
- Quebec's labour standards, pay equity and workplace health and safety board.
- CSA S269.2-16
- CSA design standard for access scaffolding, 2016 edition, cited by clause. It sets the duty classes (clause 6.2.3).
- CSA Z797:23
- CSA standard for the erection, use and inspection of access scaffolding, 2023 edition.
- Competent person
- Qualified person who checks the plan before erection or installation. An engineer must sign it when the province's regulations require it.