Estimators
TektonAI for estimators
The scaffold quantities of a bid, part by part, with their weights, before you even produce the final plan.
Today.What TektonAI does for you today.
- The bill of materials without the plan. Your assistant calculates the configuration and the parts list without producing files. It is faster for a bid.
- Start from the IFC model. Façades and storeys are read from the architect's model. You get the length and height of each façade without measuring them by hand.
- Compare variants. Frame or system scaffold, one more lift, a platform at every level: compare quantities and weights before choosing.
- Quantities in your spreadsheet. The bill of materials in Excel and CSV: mark, quantity, description, part number, dimensions and weights.
- What you already have in stock. Inventory tells you how many of each part are available, and where.
- Materials, described.
- The catalogue of common materials: actual dimensions, standards and units of sale, unbranded.
- Ask for a family: you get only that one.
- Get it as a PDF or Excel catalogue.
A quoting and invoicing tool, in preparation, will start from the bill of materials and the inventory. See the roadmap ›
In a conversation.What you can ask.
- 01
“Without producing a plan, calculate the bill of materials for a 30 m (98 ft) façade with a platform at 12 m (39 ft): compare a frame scaffold and a system scaffold.”
- 02
“Give me the total weight of the scaffold and the count of each part.”
- 03
“How many 10 ft planks are available in the yard?”